Sewell on the Go

Cottingham

Customer: Sewell on the Go, Cottingham

Solutions: Kalifornia Ecovision

Features: Height reduction and low energy

Project overview

Sewell on the Go are a multi-award winning independent forecourt operator in Hull. The Cottingham store was due a refit including replacing the refrigeration and re-configuring the store to accommodate a Subway and larger food to go area with extra Coffee machines.

What did Pastorfrigor install?

Pastorfrigor GB provided low energy Kalifornia Ecovision cabinets with a Daikin Zeas refrigerated unit on this site for a number of key reasons. Firstly, in combination with the Daikin system the refrigeration package is very low energy, the store is in a built-up area so we managed to remove 5x condensing units and replaced them with just one which gained more space and reduced the noise level near the customer’s neighbour’s properties. Another key feature of the Kalifornia Ecovision H215 is the standard height reduction kit so we managed to get extra tall cases through a standard doorway.

What were the results?

The collaboration between Pastorfrigor GB and Daikin UK provided the retailer with a system that reduced the energy bills by 60% by the time the Subway cold-rooms, ovens and additional coffee machines where installed Sewell Cottingham’s energy bill is still lower that before the refit. The rear yard now has more space for storage and the noise level as reduced from over 90db to 65db. We also managed to hand the site over 6 hours early so the retailer could start trading earlier than expected.

Be our next success story,
give us a call today 01279 876919